Value engineering
From Wikipedia, the free encyclopedia
Value Engineering is a systematic method to improve the "Value" of goods and services by using an examination of FUNCTION. Value, as defined, is the ratio of Function to Cost. Value can therefore be increased by either improving the Function or reducing the cost. It is a primary tenet of Value Engineering that quality not be reduced as a consequence of pursuing Value improvements.
In the United States, Value Engineering is specifically spelled out in Public Law 104-106, which states “Each executive agency shall establish and maintain cost-effective Value Engineering procedures and processes." [1]
Value Engineering is sometimes taught within the Project Management or industrial engineering body of knowledge as a technique in which the value of a system’s outputs is optimized by crafting a mix of performance (Function) and costs. In most cases this practice identifies and removes unnecessary expenditures, thereby increasing the value for the manufacturer and/or their customers.
Value Engineering uses intuitive logic (a unique "how" - "why" questioning technique) and the analysis of Function to identify relationships that increase Value. It is considered a quantitative method similar to the Scientific Method, which focuses on Hypothesis - Conclusion to test relationships, and Operations Research, which uses model building to identify predictive relationships.
Value Engineering is also referred to as "Value Methodology".
Contents |
[edit] The Origins of Value Engineering
Value engineering began at General Electric Co. during World War II. Because of the war, there were shortages of skilled labour, raw materials, and component parts. Lawrence Miles and Harry Erlicher at G.E. looked for acceptable substitutes. They noticed that these substitutions often reduced costs, improved the product, or both. What started out as an accident of necessity was turned into a systematic process. They called their technique “value analysis”.
As others adopted the technique, the name gradually changed to Value Engineering. VA / VE has been rehashed over the years into various other programs like lean, TQM and business process reengineering.
[edit] The Job Plan
Value Engineering is often done by systematically following a multi-stage Job Plan. Larry Miles' original system was a six-step procedure which he called the Value Analysis Job Plan. Others have varied the Job Plan to fit their constraints. Depending on the application, there may be four, five, six, or more stages. One modern version has the following eight steps:
- PREPARATION
- INFORMATION
- ANALYSIS
- CREATION
- EVALUATION
- DEVELOPMENT
- PRESENTATION
- FOLLOW-UP
Four basic steps in the Job Plan are:
- Information gathering - This asks what the requirements are for the object. Function analysis, an important technique in value engineering, is usually done in this initial stage. It tries to determine what functions or performance characteristics are important. It asks questions like; What does the object do? What must it do? What should it do? What could it do? What must it not do?
- Alternative generation (Creation) - In this stage value engineers ask; What are the various alternative ways of meeting requirements? What else will perform the desired function?
- Evaluation - In this stage all the alternatives are assessed by evaluating how well they meet the required functions and how great will the cost savings be.
- Presentation - In the final stage, the best alternative will be chosen and presented to the client for final decision.
[edit] How does it work?
VE follows a structured thought process to evaluate options. Every VE session goes through a number of steps:
1. Gather information What is being done now?
2. Measure Performance How will the alternatives be measured?
3. Analyse Functions What must be done? What does it Cost?
4. Generate Ideas (Brainstorming) What else will do the job?
5. Evaluate and Rank Ideas Which Ideas are the best?
6. Develop and Expand Ideas What are the impacts? What is the cost? What is the performance?
7. Present Ideas Sell Alternatives
[edit] Cost Optimization
Value engineering reduces costs by eliminating wasteful practices. This can be done in several areas:
- Material substitutions - Unnecessarily expensive inputs can sometimes be replaced by less expensive ones that function just as well. If a product has a life span of ten years, then using a material that lasts thirty years is wasteful. In a perfectly value engineered product, every component of that product will function perfectly until the product is no longer useful, at which time all components will deteriorate.
- Process efficiency and producibility - More efficient processes can be used and the product can be redesigned so that it is easier to produce. Reducing unnecessary parts, unnecessary precision, and unnecessary production operations can lower costs and increase manufacturability, reliability, and profits. Process engineering can be used to increase process efficiency.
- Modularity - Subassemblies that are designed and developed once and reused in many slightly different products can reduce a project's engineering and design costs. For example, a typical tape-player has a precision injection-molded tape-deck compartment. This component can be produced, assembled and tested by an independent manufacturer and sold to numerous companies as a subassembly. The tooling and design expense for the tape deck is shared over many products that can look quite different.
- Market driven product improvements - A product with more features than customers want is inefficient. Customers will be paying for features that they don’t want to pay for. Value engineering can determine how to produce a product that exactly matches the wants of a major segment of the market. When a customer needs more features, these can be sold as options.
- Energy efficiency - Value can be created by making a product or process more energy efficient for the user. This is particularly true in heating and air conditioning systems, transportation vehicles, industrial equipment, and other systems that use much energy.
When value engineers talk about reducing costs, they are usually referring to either total life cycle costs or the direct costs of production. Total life cycle costs are the total expenditures over the whole life span of the product. This measure of cost is most applicable to expensive capital equipment, and includes manufacturing costs, installation costs, maintenance costs, and decommissioning costs. Individual expenditures must be discounted to reflect the time value of money. When referring to consumer products, the direct cost of production is more typically used. This measure is limited to the costs directly associated with manufacturing the product.
[edit] Examples of Value Engineering
- Russian liquid-fuel rocket motors are intentionally designed to permit ugly (though leak-free) welding. This reduces costs by eliminating grinding and finishing operations that do not help the motor function better.
- Some Japanese disc brakes have parts toleranced to three millimeters, an easy-to-meet precision. When combined with crude statistical process controls, this assures that less than one in a million parts will fail to fit.
- Many vehicle manufacturers have active programs to reduce the numbers and types of fasteners in their product, to reduce inventory, tooling and assembly costs.
- Often a premium forming process (like "near net shape" forming) can eliminate hundreds of low-precision machining or drilling steps. Precision transfer stamping can quickly produce hundreds of high quality parts from generic rolls of steel and aluminum. Die casting is used to produce metal parts from aluminum or sturdy tin alloys (they're often about as strong as mild steels). Plastic injection molding is a powerful technique, especially if the part's special properties are supplemented with inserts of brass or steel.
- When a product incorporates a computer, it replaces many parts with software that fits into a single light-weight, low-power memory part or microcontroller. As computers grow faster, digital signal processing software is beginning to replace many analog electronic circuits for audio and sometimes radio frequency processing.
- On some printed circuit boards (itself a producibility technique), the conductors are intentionally sized to act as delay lines, resistors and inductors to reduce the parts count. An important recent innovation was to eliminate the leads of "surface mounted" components. In one stroke, this eliminated the need to drill most holes in a printed circuit board, as well as clip off the leads after soldering.
- In Japan (the land where manufacturing engineers are most valued), it is a standard process to design printed circuit boards of inexpensive phenolic resin and paper, and reduce the number of copper layers to one or two to lower costs without harming specifications.
- In a US environmental species restoration for the Black Footed Ferret, a value study using recent VEVA tools enable the species to be re-established more effectively, and with less chance of harm to the animals (VEReporting).
[edit] See also
- FVA - function value analysis
- FCA - function cost analysis
- reverse engineering
- industrial engineering
- management
- product management
- Lean Manufacturing